Gerome Manufacturing Office & Manufacturing Facility

  • Services Provided: Design-Build
  • Size: 146,000 SF

Markets Back to Top

Industrial, Office, Pre-Engineered Metal Building

Location Back to Top

Pennsylvania

Partners Back to Top

Gerome Manufacturing
Owner
Gerard Associates Architects
Architect

Summary Back to Top

Located in Fayette Business Park, this project consisted of a one-story pre-engineered shop building with a conventionally framed office. The facility was specifically designed to accommodate contract steel product manufacturing process with plasma cutting, welding, blasting, power washing, annealing, spray painting, and powder coating capabilities.